Construction Project Coordinator: Job Description, Salary and How to Hire

The short answer

A construction project coordinator keeps a project manager’s paperwork moving: submittal logs, RFIs, meeting minutes, schedule updates, change-order logs, procurement tracking and closeout manuals. You can hire one locally, use a freelancer, or add a dedicated Veltronx Admin from $12 per hour, after interviewing and skills-testing candidates at no cost.

Last updated · Salary data: U.S. Bureau of Labor Statistics, May 2025

Copy and adapt

Construction Project Coordinator job description.

We are hiring a project coordinator to support our project managers on commercial mechanical, electrical and plumbing jobs. You will own the paperwork that keeps a job moving: submittals, RFIs, meeting minutes, schedule updates, change-order logs, procurement tracking and closeout. You will work inside our project management system, keep every log current, chase open items until they close, and give each PM a clear picture of what is late, what is waiting on whom, and what needs a decision. You prepare and track; the PM reviews and decides anything that commits the company.

Responsibilities

  • Build and maintain submittal logs from the specifications, by spec section, with required dates tied to the schedule and equipment lead times.
  • Assemble submittal packages (product data, shop drawings, certifications, warranties) and send them for PM review before they go to the GC or engineer.
  • Draft RFIs from field and PM questions, log them, track responses against required dates and distribute answers to the field and estimating.
  • Take and distribute meeting minutes for OAC, coordination and internal job meetings, with open action items, owners and due dates carried forward.
  • Update look-ahead schedules and flag activities that slip, using information from the PM, foremen and the GC’s schedule.
  • Maintain the change-order log: pending, submitted, approved and rejected, with amounts and backup, so the PM always knows what is still unpaid.
  • Track procurement: purchase orders, vendor acknowledgements, release dates and delivery windows for long-lead equipment such as RTUs, switchgear and pumps.
  • Run document control in Procore or our project system: current drawing sets, revisions, ASIs and bulletins filed and superseded correctly.
  • Collect certificates of insurance, lien waivers and subcontractor documents the PM needs before work or payment.
  • Compile closeout packages: O&M manuals, warranties, as-builts, attic stock lists and training sign-offs, organized to the specification’s closeout requirements.
  • Prepare weekly status reports for each PM showing open submittals, open RFIs, pending change orders and upcoming deliveries.

Requirements

  • Two or more years coordinating commercial construction projects, ideally at a mechanical, electrical, plumbing or other specialty contractor.
  • Able to read a specification and pull submittal requirements by section, and read MEP drawings well enough to match a submittal to the design.
  • Working experience in Procore or a comparable project management platform, plus strong Excel skills for logs and trackers.
  • Clear written English: RFIs, transmittals and minutes go to GCs, engineers and owners under the company’s name.
  • Organized follow-up habits: you chase open items on a schedule, not when someone asks.
  • Comfortable working across several PMs and jobs at once without losing track of required dates.
  • Understands that the PM approves submittals, change-order pricing and anything sent that commits the company.

The work

What a construction project coordinator does day to day.

  1. 01

    Mornings start with the logs, not the inbox

    A good coordinator at a mechanical or electrical contractor opens the submittal and RFI logs first, sorts by required date, and works the list: which engineer reviews are overdue, which RFIs the GC has not answered, which equipment releases are waiting on an approved submittal. The inbox gets filed against those logs, not the other way round. By mid-morning each PM should know which three items need their attention today.

  2. 02

    Submittals decide when equipment arrives

    On an MEP job the submittal log is really a procurement schedule. A rooftop unit, a switchboard or a booster pump cannot be released until its submittal is approved, and lead times can run long. The coordinator works backwards from the install date in the schedule, through the manufacturer’s lead time and the engineer’s review period, to the date the package has to leave the office. When a date is at risk, the PM hears about it while there is still time to act.

  3. 03

    RFIs written so they get answered

    Field questions arrive as photos, texts and marked-up sheets. The coordinator turns them into RFIs that reference the drawing, detail and spec section, state the conflict plainly, propose a resolution where the PM has one, and note any cost or schedule impact the PM wants reserved. Vague RFIs come back with questions; specific ones come back with answers. Every response is distributed to the foreman and, where it changes scope, to whoever prices change orders.

  4. 04

    Meetings produce minutes with owners and dates

    Coordination and OAC meetings generate commitments that are easy to lose. The coordinator records decisions and action items with a named owner and due date, carries open items forward week to week, and sends minutes the same day. On jobs where the GC keeps the official minutes, the coordinator still keeps an internal list of what the company promised to do.

  5. 05

    Change orders tracked from field directive to payment

    A change-order log at a specialty contractor has to show everything: field directives, T&M tickets, pricing submitted, approvals, rejections and what has actually been billed. The coordinator keeps that log current and matches it against the pay application, so approved changes do not sit unbilled. Pricing and the decision to proceed stay with the PM.

  6. 06

    Closeout starts on day one

    Contractors often lose retention for months because closeout documents are missing. A coordinator who files approved submittals, warranties and O&M data as they arrive can assemble the closeout package in days, not weeks, when substantial completion comes. That directly affects when retainage is released.

Pay

Construction Project Coordinator salary in the U.S.

BLS has no occupation code for “construction project coordinator.” The closest proxy is Production, Planning and Expediting Clerks (43-5061), the people who track schedules, materials and paperwork so work stays on time: median $59,650 a year ($28.68 an hour) in May 2025. Loaded with benefits (median hourly ÷ 0.685, 2,080 hours), that is about $41.87 an hour, or roughly $87,090 a year. Project Management Specialists (13-1082), median $102,320 ($49.19 an hour), mark the ceiling: once a coordinator owns budgets and client relationships, they are paid like a PM. Real pay varies by market, trade and experience.

Production, Planning, and Expediting Clerks annual wages by percentile, May 2025
10th percentile25th percentileMedian percentile75th percentile90th percentile
$40,080$47,820$59,650$75,000$86,000

Source: U.S. Bureau of Labor Statistics, OEWS, Production, Planning, and Expediting Clerks (43-5061), May 2025, national annual wages (mean $62,150).

In-house vs a Veltronx Admin

Cost of a U.S. in-house construction project coordinator compared with a Veltronx Admin
CostU.S. in-house construction project coordinatorVeltronx Admin
Hourly wage$28.68 (U.S. median)From $12 all-in
Benefits and payroll taxesAbout 32% of total compensationIncluded
Fully loaded hourly cost$41.87From $12
Annual cost, full time$87,090 (wage $59,650; 2,080 paid hours)From $23,040 ($12 × 160 hours a month)
Recruiting, onboarding, replacementYour time and feesFree interviews and skills tests; replacement at no onboarding cost
At the starting rate, a full-time Veltronx Admin costs about $64,000 a year less than the fully loaded U.S. median for this role. Sources: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, Production, Planning, and Expediting Clerks (43-5061), May 2025; benefits share from Employer Costs for Employee Compensation, June 2026 (full-time private industry). Assumes 2,080 paid hours a year; your local wages and the rate for a given Admin vary with experience and role.

Skills that matter.

  • Reading specifications by section to extract submittal and closeout requirements
  • Reading MEP drawings well enough to match product data to the design
  • Writing clear, specific RFIs and transmittals
  • Building and maintaining logs and trackers in Excel and project software
  • Schedule awareness: working back from install dates through lead times and review periods
  • Persistent, polite follow-up with GCs, engineers, vendors and the field
  • Document control: revisions, supersedes and current sets
  • Meeting minutes with action items, owners and due dates
  • Change-order tracking from directive to billing
  • Prioritizing across several PMs and jobs at once

Software they use.

  • Procore
  • Bluebeam Revu
  • BuildingConnected
  • Excel or Google Sheets
  • Outlook or Gmail and shared calendars
  • Your accounting system’s purchase-order module (QuickBooks, Sage 300 CRE, Foundation or Viewpoint Vista)
  • Your project folders and drawing sets, inside your own accounts

How to measure the role.

Submittals sent by their required date
Late submittals push equipment releases, and late equipment pushes installation. This is the single best leading indicator of schedule risk on an MEP job.
Average RFI age and number overdue
Shows whether open questions are being chased. Old RFIs usually mean crews waiting or working at risk.
Change orders approved but not yet billed
Measures how well the change-order log ties to the pay application. Any amount here is cash the company has earned and not asked for.
Minutes distributed within one business day
Commitments recorded quickly are commitments people remember. Late minutes lose decisions.
Closeout package complete at substantial completion
Missing O&M manuals and warranties delay final payment and retainage release.
Log accuracy on spot checks
A PM should be able to pick any submittal or RFI and find the log matches the documents. Spot checks keep the logs trustworthy.

Interviewing

Construction Project Coordinator interview questions, and what a good answer sounds like.

  1. 01

    Walk me through how you build a submittal log for a new mechanical job.

    Good answer: They start from the specification, not the drawings: go section by section through Divisions 22, 23 or 26, list every required submittal, note the type (product data, shop drawing, sample, certification), then add required dates by working back from the schedule and lead times. They mention confirming the log with the PM before sending anything.

  2. 02

    An engineer has held our switchgear submittal for three weeks. What do you do?

    Good answer: Check the review period in the spec, confirm the package was complete, then follow up in writing through the GC with the lead time and install date attached. They escalate to the PM with the schedule impact rather than waiting, and they log every follow-up.

  3. 03

    A foreman texts a photo of a duct clashing with a beam. How do you turn it into an RFI?

    Good answer: Identify the drawing, grid lines and detail; state the conflict in one or two sentences; propose a resolution if the PM has one; note potential cost or schedule impact; confirm with the PM before it goes out. Then log it and set a follow-up date.

  4. 04

    How do you keep a change-order log that the PM and accounting both trust?

    Good answer: One log with every directive and T&M ticket, a status for each (pending, priced, submitted, approved, rejected), amounts and backup attached, and a regular reconciliation against the pay application so approved changes get billed. They say pricing and approvals stay with the PM.

  5. 05

    What goes into a closeout package, and when do you start it?

    Good answer: O&M manuals, warranties, as-builts, attic stock, test and balance or testing reports, training sign-offs, whatever the closeout section requires. They start filing approved submittals and warranties during the job so closeout is assembly, not a scramble.

  6. 06

    You support three PMs who all say their job is the priority. How do you plan your day?

    Good answer: Sort by required dates and consequences, not by who asked loudest. They share a short daily or weekly list with each PM so priorities are visible, and they ask a PM to decide when two deadlines truly collide.

  7. 07

    What would you never send to a GC without the PM’s approval?

    Good answer: Change-order pricing, schedule commitments, responses that accept scope or backcharges, and anything contractual. A strong candidate names the boundary without being prompted.

Hiring

How to hire a construction project coordinator: local, freelance or Veltronx.

Ways to hire a construction project coordinator compared
RouteTimelineCostBest forWatch out for
Hire locallyOften several weeks to recruit, interview and give notice, then a ramp-up period while they learn your PMs, jobs and systems.BLS proxy median $59,650 a year ($28.68 an hour, Production, Planning and Expediting Clerks, May 2025). With benefits at 31.5% of compensation, roughly $41.87 an hour or $87,090 a year fully loaded, before recruiting fees, equipment and office space.Coordinators who will also walk jobs, attend meetings in person and grow into an assistant PM role in your market.Experienced MEP coordinators are in demand and often move up to project management, so turnover is common. Budget for rehiring and the knowledge that leaves with each departure.
Freelancer or outsourced firmCan start quickly, but availability changes week to week and the first weeks go to learning your projects.Hourly or a monthly retainer, varying widely by provider and location.A short burst of closeout or document-control catch-up on one or two jobs.Coordination depends on continuity: knowing which engineer is slow, which GC wants submittals in which format. Rotating or part-time help rarely builds that memory, and you manage access and quality yourself.
Veltronx AdminInterview and skills-test candidates first at no cost. Productive in five to seven business days, with full productivity targeted in week two.Hourly, starting at $12 per hour for most Admins (about $23,040 a year at 160 hours a month), billed monthly in arrears for hours worked. Month to month with 14 days’ notice, no setup fee.MEP and specialty contractors whose PMs are buried in submittals, RFIs and logs and want a dedicated coordinator working inside Procore and their own systems every day.An offshore Admin does not walk the job or sit in the trailer. Plan for site photos and field updates to reach them, agree the hours of overlap with your PMs in writing, and spend time in the first two weeks on your log formats and approval rules.

Hiring locally, step by step

  1. 01Write down what the PMs actually need taken off their plates: which logs, which meetings, which closeout tasks. A vague “project support” posting attracts generalist administrators.
  2. 02Post on general job boards and construction-specific ones, and ask your GCs, suppliers and trade association for referrals. Former coordinators from GCs often understand submittals well.
  3. 03Screen for specialty-contractor experience. Coordinating a GC’s job and coordinating a mechanical subcontractor’s scope are related but not the same.
  4. 04Give finalists a practical test: a specification section and a drawing sheet, and ask them to build the submittal list and draft one RFI. Two hours is enough to see how they think.
  5. 05Check that they have used Procore or a comparable platform hands-on, not only viewed it.
  6. 06Call references and ask specifically about follow-up habits and how they handled missed dates.
  7. 07Expect the whole process to take often several weeks, plus notice at their current employer.
  8. 08Before day one, set up their accounts with the access the role needs, and write down which documents require PM approval before they leave the office.

Career path

Project coordinators at specialty contractors usually start in document control or as project assistants, take on full submittal and RFI ownership, and move to assistant project manager once they handle change-order pricing support and client communication. From there the path leads to project manager, where pay moves toward the Project Management Specialists range (BLS median $102,320, May 2025). Some coordinators move sideways into estimating, scheduling or operations management. At Veltronx, an Admin who coordinates well can take on more jobs and more complex scopes, and rates rise with tenure.

Hire a dedicated construction project coordinator through Veltronx, from $12 per hour

FAQ

Questions about the construction project coordinator role.

How much does a construction project coordinator make?
BLS does not track project coordinators separately. The closest proxy, Production, Planning and Expediting Clerks, had a median of $59,650 a year ($28.68 an hour) in May 2025. Coordinators who take on PM duties move toward the Project Management Specialists median of $102,320. Actual pay depends on market, trade and experience.
What is the difference between a project coordinator and a project manager?
The project manager owns the job: budget, schedule, client relationship, change-order pricing and decisions. The coordinator runs the paperwork that supports those decisions: submittals, RFIs, minutes, logs, procurement tracking and closeout. A good coordinator lets one PM run more jobs without things slipping.
Can a project coordinator work remotely or offshore?
Most of the role is document work in Procore, email and shared logs, so yes. What a remote coordinator cannot do is walk the job, so photos and field notes need a reliable path to them. Veltronx Admins work agreed hours that overlap with your office, inside your own systems.
How do you keep project documents secure with a remote coordinator?
Give least-privilege access through your own Procore, email and file accounts, never shared passwords, so you can see activity and revoke access at any time. Veltronx Admins are bound by NDAs, and the role needs no access to bank accounts or payment authority.
Will a coordinator approve submittals or price change orders?
No. The coordinator prepares submittal packages, tracks change orders and drafts correspondence. The project manager reviews submittals, sets change-order pricing and approves anything that commits the company before it is sent.
Does a project coordinator need to know MEP systems?
They need enough to read a specification by section, match product data to a schedule and spot when a package is obviously incomplete. They do not need to be an engineer. Coordinators with mechanical, electrical or plumbing experience ramp up much faster on specialty-contractor jobs.
How quickly can a Veltronx project coordinator start?
You interview and skills-test candidates first, at no cost. Once you choose, onboarding typically takes five to seven business days, with full productivity targeted in week two. If the fit is wrong, Veltronx provides a replacement at no additional onboarding cost.

Need a construction project coordinator without a months-long search?

A 30-minute discovery call: how your estimating, accounting, payroll and administrative work flows today, which systems are involved, and how a Veltronx team fits.